Solar rebates · British Columbia

Solar rebates and incentives in British Columbia

BC Hydro customers can get up to $5,000 back on rooftop solar, but since July 1, 2026, new solar customers are paid less for surplus power: 10¢ per kWh as a bill credit instead of kWh carried forward. That changes the right system size for many homes. FortisBC customers have net metering but no solar rebate. Solar panels are exempt from PST.

This is an independent summary, not an official government or utility page. Programs change, run out of funding or close. Always confirm the current rules with the program, and get any required pre-approval before you sign a contract or install anything. Rebates and loans are listed separately from export compensation (what your utility pays for electricity you send to the grid) and tax treatment.

Rebates

Open Rebate Utility

BC Hydro Solar & Battery Rebates

BC Hydro

Up to $5,000 for rooftop solar and up to $1,500 for a battery installed with it (up to $5,000 for a battery enrolled in Peak Saver).

Status: Open while funding lasts; no end date published.

Details

  • Solar: $1,000 per kW of installed DC capacity, up to 50% of the installed cost, maximum $5,000 for an individually metered home.
  • Battery: $500 per kWh of storage, up to 50% of cost; maximum $1,500 when paired with solar, or $5,000 if enrolled in BC Hydro's Peak Saver program within 14 days of interconnection approval.
  • Battery-only systems are not eligible unless enrolled in Peak Saver (rule in effect from April 1, 2026).

Who is eligible

  • BC Hydro residential account holder (or City of New Westminster electric utility customer, which runs its own matching program). FortisBC customers are not eligible.
  • You must own the property. Single-family homes, duplexes, townhomes, qualifying mobile homes and garages on the same meter.
  • From June 1, 2026 the installer must be a member of the Home Performance Contractor Network (HPCN).

Dates: Open now, first come first served while funding lasts.

How to apply

  • Submit a self-generation application and get BC Hydro's technical acceptance before you buy or install anything.
  • After installation, submit the final paid invoice.
  • The rebate is paid within about 60 days of interconnection approval.

Official source: BC Hydro: Solar and battery rebates
Last verified by us: October 30, 2026. Source last checked automatically: November 5, 2026.

Open Rebate Municipal

New Westminster Solar PV and Battery Storage Rebate

City of New Westminster Electrical Utility (with BC Hydro)

$1,000 per kW of solar up to $5,000, plus up to $1,500 for a battery installed with solar, for City of New Westminster electric customers.

Status: Open; no deadline published.

Details

  • Solar: $1,000 per kW, maximum $5,000. Battery (with solar only): $500 per kWh, minimum 5 kWh, maximum $1,500. Combined maximum $6,500.
  • All amounts are capped at 50% of cost.

Who is eligible

  • Customers of the City of New Westminster's electrical utility. A licensed contractor is required.

Dates: Open now.

How to apply

  • Apply before you buy or install. Payment within about 80 business days.

Official source: City of New Westminster: Solar PV and battery storage
Last verified by us: October 30, 2026. Source last checked automatically: November 5, 2026.

Tax exemptions

In effect Tax exemption Provincial

PST exemption for solar panels

Province of British Columbia

Solar photovoltaic panels are exempt from BC's 7% PST, as are controllers, wiring and inverters bought together with a solar system. Batteries are not exempt.

Status: In effect.

Details

  • Exemption under the Provincial Sales Tax Exemption and Refund Regulation, section 30.
  • When a contractor supplies and installs panels as part of improving real property, the contractor may have to pay PST on materials they use. Ask how your quote handles PST.

Who is eligible

  • Purchasers of qualifying solar equipment in BC.

Dates: In effect.

How to apply

  • No application: the exemption is applied at purchase, usually with your PST number or a certificate of exemption (form FIN 490).

Official source: BC PST Exemption and Refund Regulation, Part 2
Last verified by us: October 30, 2026. Source last checked automatically: November 5, 2026.

Export compensation

In effect Export compensation Utility

BC Hydro Self-Generation Service (Rate Schedule 2289)

BC Hydro

If your system produces more than you use over a billing period, the excess earns a credit of 10¢ per kWh against your Energy Charges.

Status: Applies to new solar customers from July 1, 2026. Net metering (RS 1289) is closed to new customers.

Details

  • Excess generation is measured over each billing period, not hour by hour.
  • The credit is in dollars (10¢/kWh), not kWh carried forward as under the old net metering program.
  • Credits pay Energy Charges only; the Basic Charge and other charges still apply.
  • Systems up to 100 kW AC inverter capacity (or a net injection limit of 100 kW AC per phase).

Who is eligible

  • BC Hydro customers who install generation and are approved for interconnection.

Dates: Effective July 1, 2026. Existing net metering customers keep RS 1289 for 10 years from their start date, then move to RS 2289.

How to apply

  • Apply to BC Hydro and get approval before connecting your system.

Not confirmed: BC Hydro's page does not say whether credit left over after a bill carries forward or is paid out; our reports show both possibilities.

Official source: BC Hydro: Self-generation
Last verified by us: October 30, 2026. Source last checked automatically: November 5, 2026.

Open Export compensation Utility

FortisBC Net Metering

FortisBC

Surplus electricity is banked as kWh credits for later bills; any balance is settled once a year.

Status: Open to FortisBC electric customers.

Details

  • Systems up to 50 kW, sized to no more than your expected annual consumption.
  • Excess kWh are banked and used against later bills; the yearly balance is settled at the rate FortisBC pays other power producers.

Who is eligible

  • FortisBC electric customers (Okanagan, Kootenay and Boundary regions).

Dates: Ongoing.

How to apply

  • Apply to FortisBC and get approval before building, then sign an interconnection agreement.

Not confirmed: The current price paid for the yearly surplus is not published on FortisBC's net metering page.

Official source: FortisBC: Net metering
Last verified by us: October 30, 2026. Source last checked automatically: November 5, 2026.

Federal programs

No federal solar incentive is currently open to homeowners. Details.

Which of these apply to your home?

Our report checks your utility and municipality, includes the incentives you may qualify for, and shows your payback with and without them.

Check my roof — free